ShibataFenderTeam supplied Cone Fenders for the Middle Harbor Project at Port of Long Beach, CA
The Middle Harbor Redevelopment Project at the Port of Long Beach, California began back in May 2011 and is expected to be completed ten years later, in 2021. The project will combine two old container terminals at the port into one more advanced and environmental friendly terminal. The construction work will be carried out in three phases with multiple stages to allow operations at the port to continue during the development. Taking place at Piers E, D and F the modernization will create capacity to handle more than 2 million additional containers and also reduce air pollution by 50 percent. Expanding the area of the existing terminals from 120 hectares to 140 hectares the 1280 meter-long wharf will be able to accommodate about three vessels at once.
The project has a total value of 1.5 billion USD and is planned and executed by different companies such as Moffatt & Nichol and Manson Construction . Currently the Port of Long Beach is the second busiest seaport in the US and creates 1.5 million jobs throughout the country.
ShibataFenderTeam was honored to supply the SPC 1600 Cone Fender Systems with a closed steel panel design measuring 3353 x 4334mm and additionally, Single Bit Bollards with a capacity of 200 t. An impressive video for the construction site showing the installed fenders can be found on our YouTube Channel.
We congratulate the Port of Long Beach to this outstanding infrastructure project and are grateful to be a part of this development. ShibataFenderTeam wishes successful operations to all shipping companies at Long Beach Middle Harbor. (#0084/#0657)