Contact Form.

ShibataFenderTeam Group

Please add 1 and 8.

* Mandatory fields

Your data will be used for the purpose of dealing with your enquiry and for marketing purposes. Your data will not be passed on to third parties and will only be handled internally at ShibataFenderTeam by authorized persons. We take the protection of your personal data very serious

Contact us

Shibata Fender Team

News.

Latest news about ShibataFenderTeam, orders and deliveries

SPC Cone Fender systems for Tampa, FL, USA

The Eastport Development at the Port of Tampa, FL, USA includes a 400ft long wharf with breasting dolphins, bollards and a hopper platform. The mooring layout facilitates high flexibility to handle different ship types and size as well as cargo weights.

SFT has supplied 7nos. SPC 1600 Cone Fender system for this terminal in cooperation with GLF and Mott MacDonald. The systems are equipped with 10.5’ x 11.5’ closed box steel panels and a unique feature, a safety ladder on the back side of the steel panel.

This project further strengthens SFT’s position with the Port of Tampa, after the recent successful installation at the Mosaic facilities. 

View more pictures of this installation.

Share
PreviousNext

Go back

Copyright © 2024. All Rights Reserved