Contact Form.

ShibataFenderTeam Group

* Mandatory fields

Contact us

Shibata Fender Team

News.

Latest news about ShibataFenderTeam, orders and deliveries  

Successful installation of ShibataFenderTeam fenders for LNG Terminal in Malta

In Delimara, Malta, ShibataFenderTeam recently delivered 3 sets of SPC 1800 Fender systems that were successfully installed at the Regas LNG Plant. Our task was the design of fender systems for a liquefied natural gas (LNG) import and re-gasification facility based on a floating LNG storage vessel. The project had some important limitations which we solved with a customized fender design. The need for low hull pressure was achieved with big steel panels and the minimal standoff distance was overcome with two steel spacers. 

Share
PreviousNext

Go back

Copyright © 2020. All Rights Reserved